Solar Showcase Display Map

55kW Solar Power System in Chinchilla Queensland 4413

installation by GI Energy

2A/17 Cairns St, Loganholme QLD 4129
1300 876 269


GI Energy has completed the installation of this 55kW solar power system for the Western Downs Regional Council Cultural Centre in Chinchilla Queensland. The system was installed in July 2017 as part of a 515kW overall project. There were 200 x 275w Phono Solar panels installed with an ABB Trio 50 inverter and custom designed grid protection and export control boards. The system is expected to produce approximately 84,000kWs per annum, and one year after installation the system is performing in line with these expectations.